Your First Development: Start Small, Build a Team, Learn the System

The market is hard right now. Buyers are cautious, finance is tight and build costs have not come back down. New developers can still get started, but the ones who do well begin with one simple project and learn from it.

Start with one house

A single infill dwelling is a sensible first project. It has one consent process, one builder and one budget to track, and the downside is limited if something goes wrong. Three or four dwellings multiply every risk. Do one, see how it runs, then scale up.

Decide whether you are a developer or an investor

Developers build to sell, so the numbers must work at the point of sale. Investors build to hold and care more about rental yield and long-term growth. The answer shapes your budget, design and finance, so settle it before you pay for plans.

Know your buyer

First home buyers, downsizers, families and executive buyers want different things. A first home buyer wants an efficient two or three bedroom home with low running costs. A family wants storage, a garage and separate living areas. Executive buyers pay for finish and location, but that segment tends to slow first when the market turns. Check what is selling in your suburb and how long it takes, then design for that buyer.

Build your team early

You will probably need an architect, surveyor, civil engineer and geotechnical engineer, and possibly a traffic engineer, landscape architect or acoustic consultant. They find problems while those are still cheap to fix. A lead consultant who coordinates them and deals with Council keeps your costs visible and saves you time.

Learn the council process and its costs

The build is only part of the cost. Before construction you may pay for a title review, topographical survey, resource consent, engineering approval, building consent, development contributions and service connections. Each Council has its own rules and charges. Check the title for easements, covenants and consent notices, confirm the zone and overlays, and find out whether water, wastewater and stormwater can take the extra load. Feasibility work costs money, and sometimes the answer is no. That is a cheaper result than finding out after you have bought the land.

Be ready to change the plan

Markets move. A design that suits buyers this year may not suit them in twelve months. Talk to agents and your bank regularly, and be willing to change the dwelling type, the size or the sell-or-hold decision.

If you own a site and want to know what it can support, contact Design Network Architecture for a desktop feasibility study.